9.4.1 BGA Component Reballing, Fixture Method
| Printed Board Type: R/F/C | Skill Level: Advanced | Conformance Level: High | Rev.: A | Rev. Date: 26 January 2006 |
|
Outline
This procedure
covers reballing of BGA components.
|
|
Ball Grid Array Rework Station |
Tools and Materials
Refer to Circuit Technology Center specific component reballing
instructions for machine operation, spacer construction and
screen ordering.
For plastic or tape (generally metal covered components) the
process will be to add flux paste first then apply solder balls.
Standard Reballing Flux is: EFD, FluxPlus 6-411-A Paste Flux.
This may be changed upon customer specification.
Standard Solder Paste is: EFD SolderPlus 63 RMA-A. This may
be changed upon customer specification.
Procedure
Note
BGA devices are sensitive to the affects of moisture absorption.
Proper baking according to industry moisture sensitive device
(MSD) guidelines is critical to ensuring re-balling and subsequent
BGA rework success.
- Turn on the oven and preheat to 350° Fahrenheit (176°
Celsius). Allow approximately 20 - 30 minutes for temperature
to settle between 338° to 356° F (170° to 180° C). Ensure
the FR4 baking platform (.125) is out of the oven. This
platform will need to be at ambient temperature so that
component placement is simple and smooth preventing ball
disruption. Place a thermocouple at an appropriate location
near the component in order to properly monitor ball temperatures.
- At the Re-balling Machine turn on the machine vacuum.
Align the ball stencil. If there is slight misalignment
between the flux / solder paste stencil and the ball stencil,
typically it is more important that the ball stencil be
precisely aligned than the flux stencil. Flux deposition
does not require the precision of the ball on the component
pad. The stencils are basically held in place and alignment
is done by moving the component within its nest. In the
instance that flux deposition requires absolute precision
utilize specified CTC stencil adapters (in-house machined)
to ensure fixture height, depth and width exactly conform
to reballed part dimensions.
Note
The ball stencil may be a combination of two or three stencils
stacked on top of each other. Look through a microscope
and ensure the stencils are properly aligned. There are
locating pins that are placed to do this but the stencils
may slip off the edge of the pins.
- Place Flux screen over component. Verify screen alignment
under a microscope. Screens are not held fully rigid at
their base.
- Brush flux onto the component pads through the screen.
It is important to get flux on every single pad. When flux
is not applied the pad will not hold the solder ball when
the balls are dropped into place. Additionally, a dry pad,
even if it holds a ball in place, will not properly wet
to the solder ball during reflow. On the other hand avoid
applying too much flux as excess flux on the component will
potentially gum up the solder ball screen preventing proper
ball drop onto the component. Once flux is brushed over
the screen holes use a stainless steel squeegee to press
the flux into the apertures.
- Lift the screen. Inspect under a microscope. If any
pad is missing flux, apply a small amount with an Xacto
blade tip.
- Apply solder balls over the hole locations.
Note
The more balls that are accurately placed initially the
quicker the process and the fewer balls will roll free on
the screen. An excess amount of free balls placed on the
screen may make lifting the screen clear and removing excess
balls difficult. Excess balls may spill onto component.
- Once the balls are on the screen, the ones that are
not in holes may be placed with a shortened acid brush (cut
down to about .25" length). Lift the screen once all balls
are in place. Excess balls may be collected by lifting the
screen and tapping the balls into an ESD protective container.
Note
Balls that stick with the screen must be replaced on the
component surface. Make extra balls available on a convenient
surface. These balls may be placed on the component pads
by touching a minute amount of flux paste flux to the tip
of an Xacto blade, lifting a replacement ball (using the
surface tension of the flux) and laying it in place on the
component pad.
- Once all balls are in place the component may be gently
propped up with an Xacto blade then the spatula placed under
the component to lift. Gently slide the spatula under the
component and keep the component angle as low as possible
while lifting. Once lifted, place the component on the FR4
baking platform.
- Turn the oven off momentarily (Preventing the distraction
caused by the heat and air flow of the convection oven).
Open the oven door and gently place the Baking platform
in the oven. Close the oven door. Inspect the component
balls with a microscope through the glass oven door. If
any balls have been dislodged they will have to be put back
in place. The balls do not have to be perfectly centered
on the pads as surface tension will center them during reflow.
- Turn the oven on at 500° F (260° C). On restart the oven
air will be at about 240° F (115° C). It will ramp up to reflow
temperature in about 2-3 minutes. The part itself will heat
up relatively slowly and will take about 5-7 minutes to
reflow. The balls will not reflow until the oven temperature
reaches about 448° F (231° Celsius). Testing
has demonstrated that using this procedure the component
temperature will not exceed 205° C (401° F).
Note
The re-starting temperature of the oven can vary widely due
to different times taken to place components. Testing on
component temperatures indicates that the most aggressive
placement of the components (placing in the oven when the
oven temperature is 240° F (115° C) ) results in a slightly
greater than 1° C per second rise in temperature for the
first minute. After the first minute the ramp rate slows
considerably.
Note
The BGA component may also be reflowed using an appropriate
reflow cycle at a BGA rework machine or run through a bench
top reflow oven.
- Once the component temperature reaches about 5 degrees
short of 361° F (183° C) observe the balls closely. When reflow
begins clock 30 seconds. After 30 seconds turn off the oven
to begin temperature down ramp. Very gently open oven door
by two or three inches to facilitate an appropriate cool
down ramp. Place the small deionizing fan on high about
two inches from the opening to promote even cool down of
the oven chamber.
Note
The cool down temperature ramp of the air will occur relatively
rapidly (still less than 2° C per second in the first minute).
At 130° C the components may be taken from the oven to ambient
air to cool.
- Using gloves remove the package from the oven at about
266° F (130° Celsius). Allow components to cool in ambient
temperature for three minutes to ensure package thermal
stability prior to component movement.
Evaluation
- The component balls should be perfectly aligned and
lustrous in appearance. If this is not the case, stop the
project and consult with project engineer.
- Inspect the body of the component for deformation. Also
inspect for dings and nicks in the substrate, potting compound
or die cover. Notify engineering of any defects.
- Inspect the underside of the BGA for cleanliness, flux
residue and debris left over from reballing process. If
the BGAs are not perfectly clean, inform engineering for
process corrections.
This document has been prepared by Circuit Technology Center,
Inc. The purpose is to ensure repeatable, high quality rework
of BGA components, and to assure conformity to the highest industry
standards and specifications.
Note
This document covers procedures and guidelines specific to BGA
component rework conducted by the staff at Circuit Technology
Center, Inc. Organizations using this information may need to
make modifications, or other changes, to accommodate their own
particular needs. |