Figure 1: Mill away the damaged
base material using the Micro-Drill System and ball mill.
|
| 1. |
Clean the area.
|
| |
| 2. |
Mill away the damaged board material using the
Micro-Drill System and ball mill. Remove all
evidence of the damaged material. No fibers
of laminate material should be exposed. At the
surface file the edges to ensure that the opening
is rectangular or uniform in shape. (See Figure
1).
|
| |
| |
Caution
Abrasion operations can generate electrostatic
charges.
|
| |
| 3. |
Clean the area.
|
| |
|

Figure 2: Bevel edge using the
Micro-Drill System or file.
|
| 4. |
Bevel the edge using the Micro-Drill System
and ball mill or using a file. (See Figure 2). |
| |
Or |
|

Figure 3: Mill a step into the edge
of the circuit board.
|
| |
Install an end mill into the chuck of a Precision
Drill System. Set the speed to maximum and machine
a step or lap joint in the edge of the circuit
board where the new base material will be installed.
The depth and width of the step should be approximately
1/2 of the circuit board thickness. (See Figure
3).
|
| |
| |
Caution
Exercise care to avoid damage to any internal
conductors. If any internal conductors are damaged,
surface wires may be required.
|
| |
| 5. |
Cut or machine a piece of replacement base board
material that is the same thickness and type
as the piece removed. The replacement piece
must be precisely the same size and shape of
the opening including the step joint.
|
| |
|

Figure 4: Mill a step onto the edge
of the replacement base material.
|
| 6. |
Install an end mill into the chuck of a Precision
Drill Press. Machine a step onto the entire
mating edge of the replacement base material.
The dimensions of the step should match the
size of the step in the circuit board milled
groove. (See Figure 4).
|
| |
| 7. |
Where required apply Kapton tape to protect
exposed parts of circuit board bordering the
prepared area.
|
| |
| 8. |
Check the fit to be sure the new base material
properly mates with the step in the circuit
board.
|
| |
| 9. |
Mix the epoxy.
|
| |
|

Figure 5: Bond replacement piece in place.
|
| 10. |
Coat both the tongue and groove surfaces with
epoxy and fit together. (See Figure 5). Remove
excess epoxy.
|
| |
| 11. |
Cure the epoxy per Procedure 2.7 Epoxy Mixing
and Handling.
|
| |
| 12. |
After the epoxy has cured remove
the High Temperature Tape. |
| |
| 13. |
If needed scrape off any excess epoxy using
a knife or scraper.
|
| |
| |
Note
If needed, apply additional thin coating to
seal any scraped areas.
|
| |
|

Figure 6: Completed repair. |
| 14. |
Clean the area.
|
| |
| 15. |
Complete by drilling holes, slots, etc. or adding
circuitry as required. |
|